Dryad Silvanet Documentation
Get StartedExplore SilvanetPlan a SiteDeploy SilvanetFAQ
  • Dryad Silvanet Documentation
  • Tutorials
    • Get started tutorial (Gen 2)
    • Get started tutorial (Gen 3)
    • Planning tool tutorial
  • Silvanet Suite
    • Explore Silvanet
    • Silvanet Suite (Gen 2)
      • Silvanet Wildfire Sensor (Gen 2)
      • Silvanet Mesh Gateway (Gen 2)
      • Silvanet Border Gateway (Gen 2)
    • Silvanet Suite (Gen 3)
      • Silvanet Wildfire Sensor (Gen 3)
      • Silvanet Mesh Gateway (Gen 3)
      • Silvanet Border Gateway (Gen 3)
    • Silvanet Cloud Platform
    • Silvanet Mesh Network
    • Site Management App
      • User access
      • Dashboard
      • Sites view
      • Site details
        • Device overview
        • Wildfire Sensor data
        • Device info tabs
      • Map view
      • Alert center
      • User Management view
      • User preferences
    • Deployment App
    • Fire detection
  • Site Planning
    • Plan Sites
    • Planning guidelines
      • Deployments stages
      • Scout deployment locations
      • Gateway ratios
      • Gateway ranges
      • Sensor ratios
      • Sensor range
      • Sensor density
    • Coverage planning
      • Planning tool
      • Import KML, KMZ and Shapefiles
      • High density paths
      • Low density areas
      • Connectivity zones
      • Add or move Sensors
      • Export plan
    • Packet editor
  • Silvanet Deployment
    • Deploy Silvanet
    • Deployment guidelines
      • Deployment preparation
      • Border Gateway guidelines
      • Border Gateway scenarios
      • Mesh Gateway guidelines
      • Wildfire Sensor guidelines
    • Deploy Border Gateways (Gen 2/3)
      • Register Border Gateway
      • Mount Border Gateway (Gen 2)
      • Mount Border Gateway (Gen 3)
      • Border Gateway Connectivity Test
    • Deploy Mesh Gateways (Gen 2/3)
      • Register Mesh Gateway
      • Mount Mesh Gateway (Gen 2)
      • Mount Mesh Gateway (Gen 3)
      • Mesh Gateway Connectivity Test
    • Deploy Wildfire Sensors
      • Register Wildfire Sensors
      • Mount Wildfire Sensors
      • Sensor Calibration
      • Sensor normalization
    • Relocate a Silvanet Sensor or Gateway
  • Silvanet API
    • Silvanet API - MQTT Sensor Data Integration
    • Silvanet API - Webhook Integration
  • Silvanet Test Fires
    • Overview
    • Test fire preparation
    • Run test fires
    • Modify fire setups
  • Resources
    • Contact Technical Support
    • Release Notes
    • FAQs
      • General Questions
      • Border Gateway FAQs
      • Mesh Gateway FAQs
      • Wildfire Sensor FAQs
      • Site Management FAQs
      • User Management FAQs
    • Glossary of Terms
    • Status icons
    • Device troubleshooting
    • Firmware updates (FUOTA)
    • Declaration of Conformity (EU)
  • Chandler Burning Index (CBI)
Powered by GitBook

Docs Version

  • Version 4.6.4

Sales Enquiry

  • Contact Dryad Sales

Dryad

  • Dryad.net

© 2025, Dryad Networks GmbH, Eisenbahnstr. 37, 16225 Eberswalde, Germany

On this page
  • Attach Mesh Gateways to poles
  • Attach Mesh Gateways to trees
  • Next step

Was this helpful?

Export as PDF
  1. Silvanet Deployment
  2. Deploy Mesh Gateways (Gen 2/3)

Mount Mesh Gateway (Gen 2)

The Mesh Gateway can be mounted to a metal/wooden pole or to healthy tree.

PreviousRegister Mesh GatewayNextMount Mesh Gateway (Gen 3)

Last updated 2 months ago

Was this helpful?

After a successful , the Mesh Gateway can be permanently mounted to the tree or pole. The Deployment app provided guidelines for mounting the Mesh Gateway.

Attach Mesh Gateways to poles

To attach Mesh Gateways to a metal or wood pole, the maximum dimension of the pole must be 60 mm (2.3 inch). U-Clamps are provided to attach the Mesh Gateway to the pole.

  1. Loosely attach the U-Clamps to the Mesh Gateway, then slide the Mesh Gateway onto the pole from the top, if possible.

  1. Ensure the Gateway is oriented properly (facing the sun at 12:00 noon) with the antenna connector facing upwards. You may need assistance holding the Mesh Gateway.

Maximizing radio transmissions

Ensure the pole is not interfering with radio transmission. If a metal pole is used, ensure the top of the Mesh Gateway is level with the top of the pole to allow the antenna to free from interference from the metal.

  1. Hand-tighten the nuts on the U-clamps, then use the 17 mm wrench to tighten the nuts. Do not use excessive force to prevent damage to the Border Gateway. Ensure the Mesh Gateway is securely connected to the pole and cannot move.

  2. Attach the LoRaWAN antenna to the Mesh Gateway.

Attach Mesh Gateways to trees

If the Mesh Gateway is to be attached to a tree, ensure the tree is stable and unlikely to be cut.

  1. Once a tree has been selected, use a safety strap to hold the ladder to the tree. Then with an assistant stabilizing the ladder at the bottom, locate a position on the tree that is approximately 3 m above forest floor and facing the sun (at 12:00 noon).

  2. Remove any branches that might interfere with maximum sunlight irradiation.

  3. If required, carefully remove a small portion of the bark with an axe where the holes for the treenails will be drilled. This allows the Mesh Gateway to hang vertically on the tree.

  1. Drill the top holes using the 10mm drill bit approximately 6–7 cm into the tree. The distance between the holes must be 70 mm.

Drill a pilot hole

When drilling into a tree, first drill a pilot hole using a small drill bit (1/4 inch / 6mm) then drill the final hole with the 10mm drill bit. Also, ensure you are using a drill bit for wood. This ensures the wood in the tree does not split.

When drilling into a hardwood tree, start with a smaller drill bit then drill to the final size with the 10 mm drill bit. Also, ensure you are using a drill bit for wood, not for steel or concrete.

  1. Hammer the treenails through the top loops of the Mesh Gateway into the drilled holes. Be careful not to damage the device while doing so. You may need an assistant to support the Mesh Gateway while hammering the treenails into the tree.

  1. With the Mesh Gateway attached to the tree at the top, drill through the bottom loops of the device approximately 6-7 cm into the tree. Do not damage the Mesh Gateway while drilling through the loops.

If you plan on drilling the bottom holes before attaching the Mesh Gateway to the tree, you can use the Mesh Gateway as a template to locate the positions to drill the bottom holes.

  1. Carefully hammer the treenails through the bottom loops into the holes. Do not damage the device.

  2. Attach the LoRaWAN antenna to the Mesh Gateway.

To maximize the radio connection of the Mesh Gateway, the antenna should have at least a finger-width distance from the trunk.

  1. Check to ensure the Mesh Gateway is securely connected to the tree and does not move.

Next step

After mounting the Mesh Gateway and allowing it to fully charge, run the Connectivity Test to ensure the Mesh Gateway connects with either the Border Gateway or another Mesh Gateway.

See Also

For details, see .

Mesh Gateway Connectivity Test
Device Registration
71KB
Mounting-brackets-spacing.pdf
pdf
Download the mounting bracket PDF file and print it out as a template.
Mount Mesh Gateway
U-Clamp on pole
Mounted to pole
Mesh Gateway mounted on pole
Clear a small area of bark
Spacing between holes
Mesh Gateway mounted using treenails
Carefully drill holes for bottom of Mesh Gateway
Mesh Gateway mounted to a tree