Skip to content

Pre-test checklist

Site Packet prepared with planned location of Border Gateway and sensors.

Border Gateway deployed with reliable power supply.

Border Gateway connected to Internet via Ethernet or LTE-M mobile.

Sensors deployed and QR Code scanned into the Deployment app.

DO NOT INTERACT with sensors before or during a test.

Sensors are sending data to the Silvanet Network.

Sensors calibrated in the planned location for 14 days.

Test fire material dried and stored indoors for at least 14 days.

Fire department has been informed of the test fire.

Modifications change only one element per test.

Remove burnt material before putting in new material.

Ensure burnt material from any previous test fire has been thoroughly put out and no burning embers are hidden in the ashes.

Let the sensors settle for 2-4 hours after any changes to the test, such as new burning material or sensor spacing.

Warning

DO NOT PROCEED WITH A TEST IF YOU HAVE NOT MET THE STEPS OF THE PRE-TEST CHECKLIST.

See also

For more information about planning and deploying the hardware of the Silvanet System, see Planning Deployments and Deploying Silvanet Devices.

Back to top